• Most Popular
  • Most Shared

Reuters Showcase

Tata Motors Results

Tata Motors Results

Tata Motors Q3 net jumps 40.5 pct.  Full Article 

Unitech Results

Unitech Results

Unitech hit by fall in demand for houses.  Full Article 

iPad Trouble

iPad Trouble

Apple may face iPad export ban in China trademark row.  Full Article 

Under Scrutiny

Under Scrutiny

India probes Google, Yahoo for possible forex violation.  Full Article 

No Censorship?

No Censorship?

India will never censor social media - Sibal.  Full Article 

Singapore Airshow

Singapore Airshow

Asia's biggest arms, aerospace event begins under China shadow.  Full Article 

Downgrade Threat

Downgrade Threat

Moody's warns may strip France, UK, Austria's Aaa rating.  Full Article 

India's Reliance Industries KG-D6's facility located in the Indian state of Andhra Pradesh is pictured in this undated handout photo. India's Reliance Industries Ltd resumed crude oil production from its east coast MA-1 field on March 8 following an emergency shutdown in December, Upstream Regulator V.K. Sibal said on March 12, 2009. REUTERS/Reliance Industries/Handout (INDIA ENERGY BUSINESS IMAGE OF THE DAY TOP PICTURE) FOR EDITORIAL USE ONLY. NOT FOR SALE FOR MARKETING OR ADVERTISING CAMPAIGNS

RIL's Output Woes

Reliance Industries' D6 output may fall to 27 mscmd - source.  Full Article 

Buy, Sell or Hold?

Buy, Sell or Hold?

Stock recommendations from VantageTrade.  Full Coverage 

Reuters India Mobile

Reuters India Mobile

Get the latest news on the go. Visit Reuters India on your mobile device.  Full Coverage 

Brazil, Peru to build 1,400 MW power dam -minister

BRASILIA | Tue May 20, 2008 2:25am IST

BRASILIA May 19 (Reuters) - Brazil and Peru have agreed to build a hydroelectric plant in Peru with a 1,400 megawatt capacity and are mulling 14 more power dam projects there, Brazilian Energy Minister Edison Lobao said on Monday.

Lobao told reporters the bulk of the energy from the planned dams will be sent to Brazil, Latin America's largest country, which is living a period of strong economic growth.

President Luiz Inacio Lula da Silva visited Peru last week.

Lobao did not provide details on the costs of the projects or how they would be financed.

In February, he said Brazil planned to build five hydroelectric power plants with a total capacity of 10,000 MW jointly with South American neighbors Argentina and Bolivia to boost electricity supply in the region, which has been beset by energy problems.

Brazil narrowly avoided power rationing this year after rains refilled power dam reservoirs following a long dry spell. Brazil relies on hydroelectric plants for about 80 percent of its energy needs. (Reporting by Isabel Versiani, writing by Andrei Khalip; Editing by David Gregorio)

Comments (0)
This discussion is now closed. We welcome comments on our articles for a limited period after their publication.