Reuters logo
BRIEF-JACOBS ENGINEERING SAYS SELECTED FOR A PRE-FEASIBILITY STUDY IN PERU
October 24, 2017 / 1:45 PM / a month ago

BRIEF-JACOBS ENGINEERING SAYS SELECTED FOR A PRE-FEASIBILITY STUDY IN PERU

Oct 24 (Reuters) - Jacobs Engineering Group Inc:

* JACOBS SELECTED FOR COPPER CATHODE PRODUCTION FACILITY PRE-FEASIBILITY STUDY IN PERU

* JACOBS ENGINEERING - AS PER CONTRACT, CO WILL PROVIDE CAPEX AND OPERATING EXPENDITURE ESTIMATES TO TECK AND AURUBIS FOR DETERMINING PROJECT PRE-FEASIBILITY​

* JACOBS ENGINEERING - CO SELECTED BY TECK RESOURCES LIMITED AND AURUBIS AG TO PERFORM PFS FOR A PROPOSED COPPER CATHODE PRODUCTION FACILITY IN PERU​ Source text for Eikon: Further company coverage:

Our Standards:The Thomson Reuters Trust Principles.
0 : 0
  • narrow-browser-and-phone
  • medium-browser-and-portrait-tablet
  • landscape-tablet
  • medium-wide-browser
  • wide-browser-and-larger
  • medium-browser-and-landscape-tablet
  • medium-wide-browser-and-larger
  • above-phone
  • portrait-tablet-and-above
  • above-portrait-tablet
  • landscape-tablet-and-above
  • landscape-tablet-and-medium-wide-browser
  • portrait-tablet-and-below
  • landscape-tablet-and-below