Edition:
India

Poyry Oyj (POY1V.HE)

POY1V.HE on Helsinki Stock Exchange

4.82EUR
16 Jan 2018
Change (% chg)

€0.00 (+0.00%)
Prev Close
€4.82
Open
€4.99
Day's High
€4.99
Day's Low
€4.79
Volume
2,749
Avg. Vol
14,530
52-wk High
€5.68
52-wk Low
€3.04

Latest Key Developments (Source: Significant Developments)

Pöyry Awarded Assignment In Malaysia
Thursday, 11 Jan 2018 

Jan 11 (Reuters) - POYRY OYJ ::PÖYRY AWARDED OWNER'S ENGINEER SERVICES ASSIGNMENT FOR A SOLAR PV POWER PLANT PROJECT IN MALAYSIA.AWARDED PÖYRY WITH AN OWNER'S ENGINEER SERVICES ASSIGNMENT FOR A 29 MW SOLAR PV POWER PLANT PROJECT IN KEDAH, MALAYSIA.VALUE OF ORDER IS NOT DISCLOSED.ORDER HAS BEEN RECOGNISED WITHIN ENERGY BUSINESS GROUP ORDER STOCK IN H2 2017.  Full Article

Poyry Gets Order In Malaysia​
Friday, 5 Jan 2018 

Jan 5 (Reuters) - Poyry Oyj ::‍SDN BHD AWARDED PÖYRY WITH OWNER'S ENGINEER SERVICES ASSIGNMENT FOR 1,440 MW COMBINED CYCLE POWER PLANT IN MALAYSIA​.VALUE OF ORDER IS NOT DISCLOSED.ORDER HAS BEEN RECOGNISED WITHIN ENERGY BUSINESS GROUP ORDER STOCK IN H2 2017.  Full Article

Pöyry Awarded Assignment In Turkey
Monday, 4 Dec 2017 

Dec 4 (Reuters) - Poyry Oyj ::PÖYRY AWARDED BASIC DESIGN ENGINEERING SERVICES ASSIGNMENT FOR BEYHAN II DAM AND HYDROELECTRIC POWER PLANT IN TURKEY.‍VALUE OF ORDER IS NOT DISCLOSED​.‍ORDER WILL BE RECOGNISED WITHIN ENERGY BUSINESS GROUP ORDER STOCK IN H2/2017​.  Full Article

Pöyry gets site supervision services assignment in Austria
Friday, 24 Nov 2017 

Nov 24 (Reuters) - POYRY OYJ ::PÖYRY AWARDED SITE SUPERVISION SERVICES ASSIGNMENT FOR THE REHABILITATION OF HIGHWAYS A1 AND A10 IN AUSTRIA.‍VALUE OF ORDER IS NOT DISCLOSED​.‍SITE SUPERVISION SERVICES ARE DUE TO START IN EARLY 2018 AND SCHEDULED FOR COMPLETION IN 2021​.  Full Article

Pöyry awarded engineering services assignment for new solar power plant in Brazil
Tuesday, 5 Sep 2017 

Sept 5 (Reuters) - POYRY OYJ ::PÖYRY AWARDED ENGINEERING SERVICES ASSIGNMENT FOR NEW SOLAR POWER PLANT IN BRAZIL.‍DUE TO CONTRACTUAL OBLIGATIONS, CLIENT'S NAME WILL NOT BE DISCLOSED​.‍CONSTRUCTION PHASE STARTED IN JULY 2017, AND GOAL IS TO PROVIDE ENERGY TO GRID BY JANUARY 2018​.  Full Article

Pöyry awarded engineering services assignment in the Philippines
Monday, 5 Jun 2017 

June 5 (Reuters) - POYRY OYJ ::PÖYRY AWARDED ENGINEERING SERVICES ASSIGNMENT FOR EPC SELECTION OF GLEDC'S SUPERCRITICAL POWER PLANT IN THE PHILIPPINES.POYRY OYJ - GLOBAL LUZON ENERGY DEVELOPMENT CORPORATION (GLEDC) HAS AWARDED PÖYRY WITH OWNER'S ENGINEER ASSIGNMENT FOR EPC SELECTION FOR ITS SUPERCRITICAL POWER PLANT IN LA UNION, LUZON, PHILIPPINES.  Full Article

Pöyry awarded technical consulting services assignment in Indonesia
Tuesday, 4 Oct 2016 

Poyry Oyj : Awarded technical consulting services assignment for a large ultra-supercritical thermal power plant project in Indonesia .Overall schedule for project is about 5 years.  Full Article

Pöyry awarded engineering assignment by Fénix in Mexico
Monday, 3 Oct 2016 

Poyry Oyj : Awarded engineering assignment by Fénix for future hydropower development in Mexico . Value of order is not disclosed .Order will be recognised within Energy Business Group order stock in Q3/2016.  Full Article

Pöyry awarded assignment for MGT Power Ltd in UK
Monday, 22 Aug 2016 

Poyry Oyj : Awarded Technical Owner's Engineer services assignment for 299MWe biomass Combined Heat and Power Plant for MGT Power Ltd in UK . PX Engineering Consultants Limited, part of the PX Group, has awarded Pöyry with the technical services assignment . Value of order is not disclosed .Order will be recognised within energy business group order stock in Q3 2016.  Full Article

Pöyry awarded tunnel equipment engineering assignment in Switzerland
Wednesday, 17 Aug 2016 

Poyry Oyj : Pöyry awarded tunnel equipment engineering assignment for two tunnels on the A2 motorway, Switzerland . The Swiss Federal Roads Office (FEDRO) has now awarded detailed engineering assignment to Pöyry to upgrade operational and safety equipment . Order has been recognised within Regional Operations Business Group order stock in Q3/2016 .Value of order is not disclosed.  Full Article